Yeah, it’s another one of those.
My terminal strips came in, and I’ve now completely wired the track blocks on both sections. Now I just need the other ATX extensions to arrive so I can wire the connections between the two sections and start running trains again.
A week or two ago I pulled out a scrap piece of plywood (roughly 1’x8′) and laid out the track work for a time-saver layout. At some point I think I’ll get things together to build frame work and put that together as well – I like the game aspect of it. I already have a short list of things I’ll do differently – for one I plan to lay cork under the track. I want to try different wiring techniques like soldering to the bottom of rail joiners – we’ll see how that works out. Once track is laid and wiring is done it will certainly take a back seat to the slightly bigger project (the one I’m working on now).
The current layout doesn’t have a name yet… I haven’t come up with something that I like that I can enjoy. I thought about “Dufflyn,” because it is a location at the end of a branch line, ie “End of Line” -> “[En]Dufflyn” but I still think it’s a little too cheesy.