Alright, alright. Yesterday I promised photos. But today I’m too excited to wait until I’ve uploaded them all – it’s done!
I once heard on a video that “a model railway can be finished, but it is never completed.” This is very much true for mine, which is presently nameless. I finished up the wiring this morning and tested it all, and all tracks work electrically, and I was able to fix most of the problems. I have a couple of pieces that I will need to pull out and actually fix (including a very sharp turn that I was aware of when laying, but ignored. Now I get to fix it.)
It is a very operationally intense layout. To get any of the cars from storage to a business requires the loco to run around them, and with one exception requires at least one switchback. I’ll draw up a diagram later and probably post tomorrow (with photos?) to show where things are and how it is intended to work.
Once I fix the couple of minor track faults I’ll be ready to consider scenery. I also need to create a control panel which will also involve tidying up the wirings underneath, then I can look at wiring turnout motors (and hoping they all work electrically). Another pressing issue is the electrical connections between the two sections and the control panel. The right side needs to have 4 blocks plus ground (so 5 pins) and the left needs 6 blocks plus ground (7 pins). Additionally, the left side has 5 turnouts that need to be switched and the right side has 8. Some of those can be combined, but I still need 4 pairs of circuits (9 pins – 4×2+ground) to the left and at least 4, possibly 5 or 6 to the right.
Such questions can wait to be answered tomorrow. I have more practical things to do tonight, like socializing!